COMMISSIONING & TESTING

From first power-up to first sea trial.

Marine automation systems must work correctly when the vessel leaves the dock. We provide commissioning, testing and integration services to verify that automation, control, monitoring and power systems perform as intended.

FAT • SAT • Harbour Tests • Integration Testing • Sea Trials

COMMISSIONING FLOW
FACTORY ACCEPTANCE TEST
INSTALLATION & SITE TESTING
PLC / HMI
IAS / PMS
NETWORKS
HARBOUR TEST
SEA TRIAL

COMMISSIONING PHILOSOPHY

Commissioning is where engineering becomes a working vessel system.

Marine automation involves many interconnected systems, signals and equipment from different manufacturers. A successful commissioning process therefore requires more than checking individual components.

We verify the complete control chain — from field instrumentation and I/O to PLC logic, HMI interfaces, alarms, communication networks and higher-level vessel systems.

Our objective is simple: when the vessel enters operation, the automation system should behave as a complete and predictable system rather than a collection of individual components.

OUR PROCESS

Structured commissioning from FAT to sea.

Each commissioning project is planned around the vessel, automation architecture and contractual test requirements. Testing progresses from individual functions to complete operational scenarios.

01 — FAT

Factory Acceptance Test

Verification of PLC software, HMI screens, alarm functions, control sequences, communication and system behaviour before delivery or installation.

02 — INSTALLATION

Site & Installation Verification

I/O checks, panel verification, field wiring checks, network connectivity and communication testing after equipment is installed onboard.

03 — SAT

Site Acceptance Testing

Functional testing of the installed system together with machinery interfaces, alarms, interlocks and operator controls.

04 — HARBOUR

Harbour Tests

Integrated operational tests under controlled conditions before departure, including generator, machinery and vessel control sequences.

05 — SEA TRIAL

Sea Trial Support

Verification of system performance during actual vessel operation, including control sequences, power management and integrated machinery functions.

06 — HANDOVER

Final Verification

Final functional checks, documentation, outstanding issue resolution and support during system handover to the vessel’s operating team.

WHAT WE VERIFY

Testing the complete control chain.

Commissioning becomes especially important when multiple systems and equipment suppliers must operate together. We focus on the interfaces between systems as much as the individual systems themselves.

Automation & Control

PLC sequences, automatic and manual modes, control loops, permissives, interlocks and machinery control.

Control functions and operating modes
Interlocks and permissive logic

Alarms & Safety Functions

Alarm generation, priorities, acknowledgement, shutdown functions and operator indications.

Alarm and event handling
Shutdown and protection logic

Communication & Integration

Communication between PLCs, HMIs, IAS, PMS, generators, propulsion systems and third-party equipment.

Modbus, CAN and Ethernet interfaces
Third-party system integration

Power Management

Generator control, synchronisation, load sharing, breaker sequences and power management functions.

Generator operating sequences
Load sharing and power recovery

ONBOARD COMMISSIONING

Problems are easier to solve before they become operational problems.

Our commissioning engineers work directly with vessel systems, electricians, shipyards, machinery suppliers and other automation contractors to identify and resolve integration problems.

One team at the interface.

When different systems meet onboard, the problem is often not inside one system — it is between them. We approach commissioning from the complete vessel perspective.

  • Field I/O Verification
    Sensor, actuator, wiring and signal verification.
  • Control Logic Testing
    Automatic sequences, interlocks and operating modes.
  • Communication Testing
    Network and protocol communication between systems.
  • Integrated Machinery Testing
    Testing control functions against real machinery.
  • Sea Trial Support
    Technical support during operational vessel tests.

PROJECT COMPLETION

Commissioning is complete when the system is ready for operation.

Functional Verification

Final verification that agreed control and monitoring functions operate correctly.

Documentation

Updated system information, test records and relevant commissioning documentation.

Issue Resolution

Identification and resolution of remaining technical issues before final handover.

Operational Support

Technical assistance after commissioning when the vessel enters normal operation.

COMMISSIONING SUPPORT

Bringing the automation system to life.

Planning a newbuild, retrofit or automation upgrade? Talk to us about commissioning, integration and sea trial support for your vessel.